Monday, Mark and I installed the stair spindles which put me back in touch with precision measurement and critical use of a chop saw. It was quite a bit of fun and looks very nice (if I do say so myself). ‘Twas hot, and with the 3rd finish coat, the house was pretty aromatic all day.
Lumber Liquidators are poop heads because they made multiple promises to call us after repeated delays in the shipment of our flooring. Now we will have to let Mark go on to other jobs and get in line for his services when the wood finally arrives and start all over.
The plaque for Gladys and Paul’s bench arrived again after being plated the wrong color (silver instead of gold). It really does look nice, however. The bench is in Dubois and is being installed.
I did the drip system for Cathy’s flower boxes and pots today – an expensive, but lower maintenance solution, we hope.
Meredith’s Report: the three tallest trees have fallen. Things are really up in the air for her company.
